Mining Sector
Camp Solutions

Expanding Our Expertise Beyond Tourism

With our foot firmly in Botswana’s Tourism Sector, we have now expanded operations into Botswana growing Mining Sector offering a range of camp building services and products developed specifically for the remote conditions experienced when operating within Botswana.  As a local based Citizen owned company, we are well positioned to take on construction projects for offices, staff accommodation, electrical, water and sewage reticulation offering various modular Isowall products. In addition, we offer remote mobile camps for exploration or initial housing facilities with full catering and laundry services and facilities.

 Some of our products include:

  • Modular housing and buildings
  • Sewage treatment plants both permanent and mobile
  • Solar power applications both permanent and mobile
  • Water filtration plants both permanent and mobile
  • Catering and laundry services
  • Complete Mobile exploration Camps
  • Tented accommodation
  • Site design and architectural drawings

Committed to safety our company operates a SHE policy that’s can either slot into a client’s existing SHE operations or stand alone. Our team members are strained for day-to-day camp operations as well as construction projects.

Since November 2025 camp Logic has been providing camp support services for Comadev Botswana, a new and exciting exploration company whose head office is based in Finland and are now expanding into Africa with Botswana having been the chosen country to invest in first. We are currently operating in the Kalahari Copper belt on the Sandfire exploration licences. We are currently servicing 2 camps with expected expansion up to 5 camps by the end of 2025. Our services include:

  • The provision of a tented camp for up to 30 persons per drill rig
  • Full catering with our container converted mobile kitchens
  • Full laundry Services with our converted mobile container units
  • Solar power to supply each 30-man camp
  • Water filtration and Reverse Osmosis water treatment
  • A uniquely developed mobile Sewage Treatment Plant
  • Camp management staff as well as assistance with drilling operations
  • Camp Building and camp deconstruction teams
  • Camp Design services

Previous Mining Projects in Botswana


In 2023 Camp Logic worked with African Modular Building Systems (AMBS) who were awarded the contract for the Staff Village comprising of 850 Staff Houses on the Motheo Copper Project. We Project Managed and provided local teams for Phase 1 which included 160 Staff Homes, all the infrastructure including Water, Electrical, Sewage and Fire reticulation as well as the Water Treatment Plant and the Sewer Treatment Plant. A challenging project through Covid regulations but nevertheless the phase was handed over on time, and we thoroughly enjoyed the opportunity to be involved in such a prestigious project.